EMECO was established in 2004 and is a joint Venture
between NEPCO (National Electric Power Company -
Jordan) and Mitsa International (Cyprus).
Mitsa International has over thirty years of
experience in contract supply and energized
maintenance services for MV and EHV Networks. Their
manufacturing partners are specialized in producing
and material for electrical networks.
NEPCO is the bulk transmission operator in Jordan.
The NEPCO network is composed of 400 kV and 132 kV
circuits. The transmission system is structured on
the north-south axis of Jordan. It is essentially a
radial system with no looping except for a small
ring around the main load center of Amman. The
distribution systems are served from this system at
132 kV. The direct service bulk customers are also
served from this system. There are about 2200
circuit-km of transmission lines currently operated
at 132 kV, which represents about 73% of the total
networks. In addition, there are 809 circuit-km of
transmission lines operated at 400 kV . NEPCO also
operates the main substations to provide services to